Abstract
To enhance the efficient integration of renewable energy, the optimized scheduling of joint power generation from reservoir groups has become increasingly significant. Existing research on generation scheduling primarily focuses on maximizing power generation efficiency, often overlooking the constraints posed by the delivery capacity of cascade power stations. In response, this study introduces a scheduling model for joint power generation from reservoir groups that accounts for flow limit constraints. The outer layer of the model employs the Dynamic Programming Successive Approximation(DPSA)method, while the inner layer allocates output among the units based on installed capacity. Using the typical autumn days in 2020 of the Three Gorges-Gezhouba and Qingjiang cascade power stations as research cases, a comparison is made with actual operational scheduling processes. The results indicate that under conditions without flow limit constraints, the joint scheduling plan for the Three Gorges-Gezhouba and Qingjiang cascade power stations can achieve the highest power generation efficiency. However, with the implementation of flow limit constraints, the proportional increase in system generation compared to the actual scheduling plan decreases by 0.73%, with increases for the Three Gorges and Qingjiang cascade power stations dropping by 0.72% and 0.81%, respectively. This underscores the significant impact of flow limit constraints on the maximum generation capacity of source power plants, highlighting that the rational allocation of output of each power plant unit is critical for ensuring the safe and stable operation of the power grid. The method proposed in this paper provides both theoretical justification and practical guidance for the joint power generation scheduling of cascade reservoirs. © 2025 Editorial Office Of China Rural Water And Hydropower. All rights reserved.
| Translated title of the contribution | A Professional Exploration of Joint Power Generation Scheduling in Reservoir Systems Considering Flow Limit Constraints |
|---|---|
| Original language | Chinese |
| Pages (from-to) | 187-197 |
| Number of pages | 11 |
| Journal | China Rural Water and Hydropower |
| Issue number | 11 |
| State | Published - Jan 2025 |
Funding
中国长江电力股份有限公司资助项目(Z242302040);
Indexed by
- Scopus
Fingerprint
Dive into the research topics of 'A Professional Exploration of Joint Power Generation Scheduling in Reservoir Systems Considering Flow Limit Constraints'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver