Abstract
Three dimensional FEM is adopted to analyze the stress and deformation of spiral case of Gezhouba Hydropower Station under the statuses : before the capacity-increasing improvement ; during the disassembly of the spiral case ; after the capacity-increasing improvement. Based on the calculation, the reinforcement scheme for the spiral case is proposed, and then the FEM calculation is also made on the scheme. Through the comparative analysis on the phase Ⅱ concrete for the cone section under the three statuses mentioned above, it shows that not only the unit disassembly scheme is feasible, but the reinforcement design is also effective.
| Translated title of the contribution | Study on unit disassembly and spiral case reinforcement during capacity-increasing improvement for Gezhouba Hydropower Station |
|---|---|
| Original language | Chinese |
| Pages (from-to) | 56-59 |
| Number of pages | 4 |
| Journal | Water Resources and Hydropower Engineering |
| Issue number | 2 |
| State | Published - 1 Feb 2010 |
Indexed by
- CSCD
Fingerprint
Dive into the research topics of 'Study on unit disassembly and spiral case reinforcement during capacity-increasing improvement for Gezhouba Hydropower Station'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver