Skip to main navigation Skip to search Skip to main content

负荷历时曲线法在梁子湖流域污染容量总量控制中的应用

Translated title of the contribution: LOAD DURATION CURVE METHOD IN LIANGZI LAKE BASIN POLLUTION CAPACITY TATAL AMOUNT CONTROL
  • 王 生愿
  • , 桂 发二
  • , 方 纬
  • 浙江贵仁信息科技股份有限公司

Research output: Contribution to journal › Article › peer-review

Abstract

By using the load duration curve(LDC), we studied the water environmental carrying capacity to determine the total maximum daily load(TMDL) based on the target of water quality protection. Using the hydrological and water quality data of 2008-2011 in Liangzi Lake watershed, we employed the main pollutant COD as an indicator to apply the LDC to Liangzi Lake, and analyzed the variation characteristics of the TMDL, and put forward the amount of pollution load reduction under different hydrological conditions. Results show: Liangzi Lake was greatly influenced by non-point source pollution. For Gaoqiao River, Xujia River, Zhangqiao River, Shanpo River, Ning River in the Liangzi Lake Basin, the actual COD load was beyond the permission in high flow period, the reduction amounts are 61.36t/d, 4.33t/d, 12.98t/d,3.84t/d, 7.13t/d, respectively; For Xujia River and Ning River, the actual COD load was beyond the permitted load in the wet season, the reduction amounts are 0.16t/d and 0.17t/d, respectively. This study would be valuable for the management and pollution control.
Translated title of the contributionLOAD DURATION CURVE METHOD IN LIANGZI LAKE BASIN POLLUTION CAPACITY TATAL AMOUNT CONTROL
Original languageChinese
Pages (from-to)845-850
Number of pages6
JournalResources and Environment in the Yangtze Basin
Volume25
Issue number5
StatePublished - 1 May 2016

Funding

"十二五"水专项;三峡库区及上游流域水环境风险评估与预警技术研究与示范课题(2013ZX07503-001-01)~~

Indexed by

  • CSCD
  • CSSCI

Fingerprint

Dive into the research topics of 'LOAD DURATION CURVE METHOD IN LIANGZI LAKE BASIN POLLUTION CAPACITY TATAL AMOUNT CONTROL'. Together they form a unique fingerprint.

Cite this