Skip to main navigation Skip to search Skip to main content

Application of BP neural network approach for cost estimation of wastewater treatment plants: A case study of Taiwan region

  • Jiang Ru*
  • , Zhu Huayue
  • , Chang Yuhua
  • *Corresponding author for this work
  • Taizhou University

Research output: Chapter in Book/Report/Conference proceeding › Conference contribution › peer-review

4 Scopus citations

Abstract

Reliable cost estimation is crucial to the planning process of a wastewater treatment plant (WWTP). Among the developed methods in literatures, not only the assumption of linearity but the existence of a great deal of uncertainty limits the actual application. In this paper, cost estimation of WWTPs in Taiwan region using BP neural network (NN) was investigated. The correlations between cost related variables and total construction cost and plant construction cost were obtained based on 26 collected data sets of design flow rate, influent BOD5 concentration and cost data etc. The study revealed that the proposed NN outperformed linear regression in respect to performance measures such as mean absolute error rate and coefficient of determination. Results from weight interpretation reflected the relative importance of input variables to costs. The NN-based approach can provide an economical and rapid means of cost estimation of WWTP.
Original languageEnglish
Title of host publicationPROCEEDINGS OF THE 2009 INTERNATIONAL CONFERENCE ON COMPUTATIONAL INTELLIGENCE AND NATURAL COMPUTING, VOL I
PublisherIEEE; IEEE Circuits and Systems Society (CAS); IEEE Communications Society (ComSoc); IEEE Computer Society; IEEE Signal Processing Society
Pages250-253
Number of pages2
ISBN (Print)978-0-7695-3645-3
DOIs
StatePublished - 6 Jun 2009

Publication series

NameApplication of BP neural network approach for cost estimation of wastewater treatment plants: A case study of Taiwan region

Indexed by

  • CPCI-S
  • EI
  • Scopus

Fingerprint

Dive into the research topics of 'Application of BP neural network approach for cost estimation of wastewater treatment plants: A case study of Taiwan region'. Together they form a unique fingerprint.

Cite this