Skip to main navigation Skip to search Skip to main content

Channel re-establishment of the Lower Yellow River in ten years operation of Xiaolangdi Reservoir

Translated title of the contribution: Channel re-establishment of the Lower Yellow River in ten years operation of Xiaolangdi Reservoir
  • Chen Jian-Guo
  • , Zhou Wen-Hao
  • , Chen Qiang
  • China Institute of Water Resources and Hydropower Research

Research output: Contribution to journal › Article › peer-review

21 Scopus citations

Abstract

The Xiaolangdi Hydro-Project is a large project downstream of the Sanmenxia Project in the Yellow River playing the role of flood control and sedimentation mitigation. The reservoir has been operated for 10 years. Based on the field measured data, the reservoir sedimentation and the channel re-establishment of the Lower Yellow River including the morphology of the reservoir deposition, the density current and its sediment transport, the characteristics and efficiency of channel erosion, the coarsening of bed sediment and effects of channel armoring, the relationship between reservoir deposition and channel erosion, as well as the compensation index of reservoir deposition, are analyzed and expounded in this paper. These results are helpful to understand the new behavior of fluvial processes of the river carrying large amount of sediment load such as the Yellow River in the initial period of reservior operation.
Translated title of the contributionChannel re-establishment of the Lower Yellow River in ten years operation of Xiaolangdi Reservoir
Original languageChinese
Pages (from-to)127-135
Number of pages9
JournalShuili Xuebao/Journal of Hydraulic Engineering
Volume43
Issue number2
StatePublished - Jan 2012

Indexed by

  • Scopus

Fingerprint

Dive into the research topics of 'Channel re-establishment of the Lower Yellow River in ten years operation of Xiaolangdi Reservoir'. Together they form a unique fingerprint.

Cite this