Abstract
The cascade hydropower reservoirs which are located in the upstream of Yellow River, have been designed for many purposes, such as power generation, irrigation, flood control, ice prevention, and navigation etc. To solve the special demands of this system, this paper has put forward an optimal operation model with constraints of the water level, release and output. The objective function is to maximize the whole power generation of the system on the basis of achieving the guaranteed output and changing the constraints into a part of objective function by using penalty function method, then applying DP and DDDP for calculation. It is shown that this algorithm can effectively solve the long-term optimal joint operation model with complicated and various constraints.
| Translated title of the contribution | Dynamic programming method for the multi-purpose operation of cascade reservoirs |
|---|---|
| Original language | Chinese |
| Pages (from-to) | 1-4 |
| Number of pages | 4 |
| Journal | Shuili Fadian Xuebao/Journal of Hydroelectric Engineering |
| Volume | 26 |
| Issue number | 2 |
| State | Published - Jan 2007 |
Indexed by
- Scopus
Fingerprint
Dive into the research topics of 'Dynamic programming method for the multi-purpose operation of cascade reservoirs'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver