Estimation of Excavation Disturbed Zone of High Slope in the Left Bank of Jinping-1 Hydropower Station

  • Jun Peng*
  • , Guan Rong
  • , Zhilin Li
  • *Corresponding author for this work
  • Three Gorges Int Tendering Co Ltd

Research output: Chapter in Book/Report/Conference proceeding › Conference contribution › peer-review

Abstract

The proposed Jinping-I hydropower station is located on the middle reach of the Yalongjiang River, Sichuan Province, P.R. China. It consists of a double-curvature arch dam with a maximum height of 305 m, which will be the highest in the world. Excavation disturbed zone (EDZ) in the left bank slope is one of the most important aspects in slope stability and deformation evaluation. This paper is focused on estimation of EDZ in the left bank slope of Jinping-I hydropower station based on numerical simulation. Geological conditions of the left bank slope are firstly analyzed. Then, displacement field of the slope during excavation is calculated by finite element method (FEM). It can be indicated that the model and parameters in this paper is reasonable by comparing observed results with calculated ones. EDZ in the left bank slope can be estimated based on the calculated displacement field. It can be inferred that the range of EDZ is related to the controlling discontinuities such as fault f42-9 and Lamprophyre X etc. which are adjacent to the excavation line.
Original languageEnglish
Title of host publicationADVANCES IN HYDROLOGY AND HYDRAULIC ENGINEERING, PTS 1 AND 2
PublisherTrans Tech Publications Ltd
Pages998-1003
Number of pages2
ISBN (Print)0878494537, 9783037852606, 9783037852620, 9783037854228, 978-3-03785-486-0, 9783037857236, 9783037858332, 9783037858745, 9783037859322, 9783038351382, 9783038352914
DOIs
StatePublished - 10 Aug 2012

Publication series

NameApplied Mechanics and Materials
Volume212-213
ISSN (Print)1660-9336

Funding

The research work presented in this paper is sponsored by the National Basic Research Program of China ("973" Program) (Grant Nos. 2011CB013501 and 2010CB732005), the National Natural Science Foundation of China (Grant No. 50879081) and Program for New Century Excellent Talents in University (Grant No. NCET-11-0406). The authors would like to thank for the support.

Indexed by

  • CPCI-S
  • EI
  • Scopus

Fingerprint

Dive into the research topics of 'Estimation of Excavation Disturbed Zone of High Slope in the Left Bank of Jinping-1 Hydropower Station'. Together they form a unique fingerprint.

Cite this