Abstract
When sediment discharge method is used to calculate the amount of river channel erosion and deposition, measurement errors and sediment amounts caused by bank collapse, sand mining, diversion and conflux, and water imbalance, need to be considered. This study used sediment discharge method to calculate the sediment amounts of river channel erosion and deposition in the reaches of Yichang-Zhicheng, Zhicheng-Shashi, and Shashi-Jianli for the period from Nov. 2002 to Oct. 2008, using measured data of suspended load and bed load at the hydrological stations downstream of the Three Gorges dam, i.e. Yichang, Zhicheng, Shashi, and Jianli. These calculations were then modified with the data of sand mining, bank collapse and sediment diversion in the Yangtze channel and the field observation data of near-bed suspended load collected by Bureau of Hydrology, Changjiang Water Resources Commission (BOH, CWRC) in 2006. Comparison of the calculations and their modifications with the results by topographic method shows the necessary of modification. © Copyright
| Translated title of the contribution | Modifying the channel erosion and deposition amount of Yichang-Jianli reach calculated by sediment discharge method |
|---|---|
| Original language | Chinese |
| Pages (from-to) | 163-169 |
| Number of pages | 7 |
| Journal | Shuili Fadian Xuebao/Journal of Hydroelectric Engineering |
| Volume | 33 |
| Issue number | 4 |
| State | Published - Jan 2014 |
Indexed by
- Scopus
Fingerprint
Dive into the research topics of 'Modifying the channel erosion and deposition amount of Yichang-Jianli reach calculated by sediment discharge method'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver