Skip to main navigation Skip to search Skip to main content

On time delivery model with vendor inventory liability period in assembly system with random demand time

Translated title of the contribution: On time delivery model with vendor inventory liability period in assembly system with random demand time
  • Xu Guan
  • , Shi-Hua Ma
  • , Dan-Feng Ying
  • School of Management

Research output: Contribution to journal › Article › peer-review

Abstract

Under VMI policy, manufacturer can use vendor inventory liability period to mitigate the risk caused by an uncertain demand time. This paper investigates the suppliers' optimal delivery times and manufacturer's vendor inventory liability period respectively in a decentralized assembly system setting. Building a basic model with a single supplier and an extend model consisted by multi-suppliers, the optimal choices for both parties have been figured out by both mathematical justification and sequential procedure. The results show that it is not wise for manufacturer to set a too long liability period, and the unsynchronized deliveries among suppliers can heavily hurt supply chain performance. Additionally, we provide the coordination mechanism and numerical example.
Translated title of the contributionOn time delivery model with vendor inventory liability period in assembly system with random demand time
Original languageChinese
Pages (from-to)2220-2228
JournalXitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice
Volume33
Issue number9
StatePublished - Sep 2013

Indexed by

  • EI

Fingerprint

Dive into the research topics of 'On time delivery model with vendor inventory liability period in assembly system with random demand time'. Together they form a unique fingerprint.

Cite this