Abstract
Pubugou hydropower project is located in the middle reaches of Dadu River in Sichuan province, China. The height of the rockfill dam is 186 m, the gross reservoir storage capacity is 5.39×109 m3, and the installed capacity is 3.30×106 kW.The constructionwork started in 2001. In 2002, the slope in the lowposition on the right bank was excavated to build the access road, which triggered large deformation. In 2003, the geological investigation revealed that the deformed body is a potential landslide. The potential landslide is 780m distance from the dam axis on the right bank of upstream, near by the water intake of the power station and the diversion intake. It is a serious threat to the construction and the operation of the project. Therefore, the FEM analysis on the potential landslide is carried out.Through the comprehensive comparison of the calculation results, the stability of the slope are calibrated and the reinforcement scheme is suggested. The results show that the project is in well operation under the suggested reinforcement scheme. © 2010 Taylor & Francis Group.
| Original language | English |
|---|---|
| Pages | 667-670 |
| State | Published - 15 Jun 2010 |
| Event | European Rock Mechanics Symposium, EUROCK 2010 - Lausanne, Switzerland, Lausanne, Switzerland Duration: 15 Jun 2010 → 18 Jun 2010 |
Conference
| Conference | European Rock Mechanics Symposium, EUROCK 2010 |
|---|---|
| Country/Territory | Switzerland |
| City | Lausanne |
| Period | 15/06/10 → 18/06/10 |
Indexed by
- EI
Fingerprint
Dive into the research topics of 'Stability analysis on the reservoir bank slope in pubugou hydropower project'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver