Skip to main navigation Skip to search Skip to main content

Study on the impounding time and objective decision of the Three Gorges Project at the end of flood period

Translated title of the contribution: Study on the impounding time and objective decision of the Three Gorges Project at the end of flood period
  • Peng Yang
  • , Li Yi-Tian
  • , Zhang Hong-Wu
  • Lab. of Water and Sediment Sci.

Research output: Contribution to journal › Article › peer-review

8 Scopus citations

Abstract

To counter the contradictions among the electricity generation, flood control and navigation in the Three Gorges Project (TGP) operation, the flood risk and the benefit of generation and shipping in different impounding schemes was studied. The reservoir water sediment regulation multi-purpose decision model was developed according to the relationships among the flood risk, generation and shipping benefit. In order to study its optimum impounding time and mode, a weighted balance mode was applied to decide an optimum impounding scheme. The results can be used for the TGP operation.
Translated title of the contributionStudy on the impounding time and objective decision of the Three Gorges Project at the end of flood period
Original languageChinese
Pages (from-to)682-689
Number of pages8
JournalAdvances in Water Science
Volume14
Issue number6
StatePublished - Jan 2003

Indexed by

  • Scopus

Fingerprint

Dive into the research topics of 'Study on the impounding time and objective decision of the Three Gorges Project at the end of flood period'. Together they form a unique fingerprint.

Cite this