Abstract
We present a heuristic scheduling algorithm for MPS (Multi Processor System) with incompatible jobs, and give the performance analysis about this algorthm. Some scheduling problem can be solved based on the heuristic method in polymonial time complexity when the job graphs have some special structures such as bipartite graph,tree and so on.
| Translated title of the contribution | The scheduling problem for MPS with incompatible jobs |
|---|---|
| Original language | Chinese |
| Pages (from-to) | 279 |
| Journal | Wuhan Daxue Xuebao/Journal of Wuhan University |
| Volume | 46 |
| Issue number | 3 |
| State | Published - Jan 2000 |
Keywords
- Incompatible jobs
- Scheduling algorithm
- Time complexity
Indexed by
- Scopus
Fingerprint
Dive into the research topics of 'The scheduling problem for MPS with incompatible jobs'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver