Abstract
This paper describes the simulated model-made test of large pre-stressed concrete aqueduct of the Middle Route of South to North Water Transfer Project in Ming River of Hebei province. Several key techniques such as the simulation of material property and abutment property, and construction organization of pre-stressed aqueduct model in simulation test have been discussed. The experience of its success has the important referential value in similar structural model-made test.
| Original language | English |
|---|---|
| Pages | 1867 |
| State | Published - 4 Jun 2003 |
| Event | Canadian Society for Civil Engineering - 31st Annual Conference: 2003 Building our Civilization - Moncton, NB, Canada, Moncton, Canada Duration: 4 Jun 2003 → 7 Jun 2003 |
Conference
| Conference | Canadian Society for Civil Engineering - 31st Annual Conference: 2003 Building our Civilization |
|---|---|
| Country/Territory | Canada |
| City | Moncton |
| Period | 4/06/03 → 7/06/03 |
Indexed by
- EI
Fingerprint
Dive into the research topics of 'The study on simulated model-made test of large pre-stressed concrete aqueduct'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver