The Two-machine Flow-shop Scheduling Problem with a Single Server and Unit Server Times

  • Shi Ling*
  • , Cheng Xue Guang
  • *Corresponding author for this work
  • Hubei Univ Nat

Research output: Contribution to journal › Article › peer-review

Abstract

We consider the problem of two-machine flow-shop scheduling with a single server and unit server times, we show that this problem is NP-hard in the strong sense and present a simple greedy algorithm for it with worst-case bound 3/2.
Original languageEnglish
Pages (from-to)123-127
Number of pages5
JournalJOURNAL OF INFORMATICS AND MATHEMATICAL SCIENCES
Volume4
Issue number1
StatePublished - Jan 2012

Keywords

  • Two-machine
  • Flow-shop
  • Single server
  • Complexity
  • NP-hardness
  • Worst-case analysis