TY - GEN
T1 - Uncertainty Evaluation of Copper Reference Solution
AU - Li, Yu-lei
AU - Liao, Dong-mei
AU - Rui, Rui
PY - 2014/1
Y1 - 2014/1
N2 - In fuel-fired power plants, error resulting from test process of copper content should be decreased to minimum because trace copper is in the steam-water. 100 mu g/mL copper reference solution is prepared in the laboratory and its concentration is determined by means of EDTA compleximetry. Then the uncertainty is analyzed and calculated from every factor. The result shows that the expanded uncertainty of 100 mu g/mL copper reference solution is 0.6 mu g/mL.
AB - In fuel-fired power plants, error resulting from test process of copper content should be decreased to minimum because trace copper is in the steam-water. 100 mu g/mL copper reference solution is prepared in the laboratory and its concentration is determined by means of EDTA compleximetry. Then the uncertainty is analyzed and calculated from every factor. The result shows that the expanded uncertainty of 100 mu g/mL copper reference solution is 0.6 mu g/mL.
KW - uncertainty of reference solution concentration
KW - copper reference solution
KW - uncertainty evaluation
UR - https://openir.whu.edu.cn/AchievementDetail/WOS_c25f7ad5-089c-4c7b-a640-be58d500d7ff
U2 - 10.4028/www.scientific.net/amr.881-883.1827
DO - 10.4028/www.scientific.net/amr.881-883.1827
M3 - Conference contribution
SN - 9780878494033
SN - 9780878499724
SN - 9783037851234
SN - 9783037851258
SN - 9783037853566
SN - 9783037855225
SN - 9783037855942
SN - 9783037856383
SN - 9783037858257
SN - 978-3-03785-994-0
SN - 9783038351504
T3 - Advanced Materials Research
SP - 1827
EP - 1831
BT - CHEMICAL, MATERIAL AND METALLURGICAL ENGINEERING III, PTS 1-3
PB - Trans Tech Publications Ltd
ER -