摘要
The deadlock-handling scheme is based on a bipartite graph model of the part-machine relationship in the manufacturing cell. A distinction is made between permanent deadlock and transient deadlock. Permanent deadlock depicts a manufacturing system state where parts are irrevocably blocked and where external intervention is required to resolve the deadlock, whereas a transient deadlock indicates that there is a positive probability that the deadlock will resolve itself over time. To recover from deadlocks, one control policy is studied: resolve deadlocks in the manufacturing cell. Under the policy, it is shown that it is sufficient to resolve any cycle in the set of deadlocked parts to resolve the deadlock. Finally, we estimate the deadlocks in flexible manufacturing cells.
| 源语言 | 英语 |
|---|---|
| 页(从-至) | 1117-1120 |
| 期刊 | Wuhan Ligong Daxue Xuebao/Journal of Wuhan University of Technology |
| 卷 | 28 |
| 期 | S3 |
| 出版状态 | 已出版 - 1 6月 2006 |
收录
- EI
学术指纹
探究 'A graph theoretic method to handle deadlocks in flexible manufacturing cells' 的科研主题。它们共同构成独一无二的学术指纹。引用此
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver