跳到主要导航 跳到搜索 跳到主要内容

A Risk-Aware Dynamic Multi-objective Evolutionary Algorithm for Distributed Flexible Job Shop Scheduling with Machine Deterioration

  • Hu Peng*
  • , RunCheng Wang
  • , Chao Zhou
  • , Hui Wang
  • , Zhijian Wu
  • *此作品的通讯作者
  • Jiujiang University
  • Jiujiang Key Laboratory of Digital Technology
  • Jiangxi University of Water Resources and Electric Power

科研成果: 期刊稿件 › 论文 › 同行评审

摘要

With the deepening of globalization and industry 4.0, distributed intelligent scheduling has become pivotal to green and sustainable manufacturing. However, real-world production not only faces performance degradation caused by the continuous deterioration of machines, but also often encounters a high degree of uncertainty in processing time due to various factors. To solve this problem, this paper constructs a dynamic distributed scheduling model integrating machine deterioration and type-2 fuzzy processing times. In order to realize the collaborative optimization of makespan and energy consumption, this paper proposes a risk-aware dynamic multi-objective evolutionary algorithm (RADEA). Firstly, proactive-reactive reliability governance (PR2G) is designed. It establishes a double-loop control system that actively predicts failure probability to trigger proactive maintenance (proactive loop) and quantifies environmental drift to adjust search intensity (reactive loop), thereby intelligently balancing risk mitigation and exploration. In addition, a novel predictive-risk-aware tchebycheff (PR-TCH) aggregation function is designed to quantitatively integrate reliability assessments into the selection process, implicitly filtering out fragile schedules. Experimental results on 30 instances against four advanced algorithms demonstrate that RADEA exhibits superior competitiveness, particularly in proactively mitigating quality risks and maintaining solution diversity in stochastic environments. © 1997-2012 IEEE.
源语言英语
期刊IEEE Transactions on Evolutionary Computation
DOI
出版状态刊载前的电子出版物 - 1月 2026

关键词

  • Competition
  • Deterioration
  • Evolutionary algorithms
  • Fuzzy systems
  • Green manufacturing
  • Industry 4.0
  • Job shop scheduling
  • Multiobjective optimization
  • Praseodymium compounds
  • Reliability
  • Risk assessment
  • Scheduling algorithms
  • Distributed flexible job scheduling
  • Dynamic multi-objective evolutionary algorithm
  • Flexible job-shop scheduling
  • Fuzzy processing time
  • Jobs scheduling
  • Machine deterioration
  • Multi-Objective Evolutionary Algorithm
  • Risk aware
  • Type-2 fuzzy
  • Type-2 fuzzy processing time
  • Stochastic systems
  • Type-2 fuzzy processing time(T2FPT)

收录

  • Scopus
  • EI

学术指纹

探究 'A Risk-Aware Dynamic Multi-objective Evolutionary Algorithm for Distributed Flexible Job Shop Scheduling with Machine Deterioration' 的科研主题。它们共同构成独一无二的学术指纹。

引用此