Construction progress risk of hydropower engineering under the condition of earth-rock overtop cofferdam

  • Shu Chen
  • , Zhi-Gen Hu

科研成果: 期刊稿件 › 论文 › 同行评审

摘要

Impacted by the time randomness of pit submerged and recovery, uncertainty factors such as process duration, effective construction days and the completion date, lead that the construction progress delay of hydropower engineering under the condition of earth-rock overtop cofferdam is unpredictable. Based on the online characteristics of construction progress risk, the construction progress risk of hydropower engineering is analyzed and then an online progress risk model is built. Furthermore the competitive ratio of the strategy is calculated. In the light of the relationship between the general online strategy and the optimal offline strategy, the risk-reward model to optimize the risk compensation strategy is introduced. Simultaneously, the risk compensation strategy is optimized according to the different decision-makers' risk tolerance and forecast.
投稿的翻译标题Construction progress risk of hydropower engineering under the condition of earth-rock overtop cofferdam
源语言中文
页(从-至)1622-1627
期刊Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice
卷33
期6
出版状态已出版 - 6月 2013