摘要
When sediment discharge method is used to calculate the amount of river channel erosion and deposition, measurement errors and sediment amounts caused by bank collapse, sand mining, diversion and conflux, and water imbalance, need to be considered. This study used sediment discharge method to calculate the sediment amounts of river channel erosion and deposition in the reaches of Yichang-Zhicheng, Zhicheng-Shashi, and Shashi-Jianli for the period from Nov. 2002 to Oct. 2008, using measured data of suspended load and bed load at the hydrological stations downstream of the Three Gorges dam, i.e. Yichang, Zhicheng, Shashi, and Jianli. These calculations were then modified with the data of sand mining, bank collapse and sediment diversion in the Yangtze channel and the field observation data of near-bed suspended load collected by Bureau of Hydrology, Changjiang Water Resources Commission (BOH, CWRC) in 2006. Comparison of the calculations and their modifications with the results by topographic method shows the necessary of modification. © Copyright
| 投稿的翻译标题 | Modifying the channel erosion and deposition amount of Yichang-Jianli reach calculated by sediment discharge method |
|---|---|
| 源语言 | 中文 |
| 页(从-至) | 163-169 |
| 页数 | 7 |
| 期刊 | Shuili Fadian Xuebao/Journal of Hydroelectric Engineering |
| 卷 | 33 |
| 期 | 4 |
| 出版状态 | 已出版 - 1月 2014 |
关键词
- Amount of river channel erosion and deposition
- Bank collapse
- River sediment engineering
- Sand mining
- Sediment discharge method
- Topography method
收录
- Scopus
学术指纹
探究 'Modifying the channel erosion and deposition amount of Yichang-Jianli reach calculated by sediment discharge method' 的科研主题。它们共同构成独一无二的学术指纹。引用此
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver