Open-phase temporary overvoltage before and after an intermediate subsation accessing a long distance transmission line

科研成果: 期刊稿件 › 论文 › 同行评审

2 引用 (Scopus)

摘要

In transmission lines, shunt-reactors are commonly applied to counteract the "Ferranti effect." However, in highly compensated lines, hazardous overvoltage may occur during unbalanced open-phase conditions. In addition, when a new substation is put into operation, pi circuit can be selected by accessing an existing transmission line and the original shunt-reactor configuration is maintained. Severe overvoltage may occur on the shunt-reactor side of the newly installed transmission line. In this study, we analysed the effects of compensation, neutral-reactor, and system frequency on open-phase overvoltage. The maximum deviation of system frequency is <+/- 0.5 Hz, therefore, we suggested maximum critical compensation of the shunt-reactor under different proportional coefficients of neutral-reactor. We analysed the impact of line division, when an intermediate substation is accessed, and a risk range in which the substation located may cause severe overvoltage was proposed. Finally, according to an actual line division project, we optimised the original configuration scheme of the shunt and neutral-reactors. We used electromagnetic transient simulation to verify whether severe overvoltage occurred before and after the power station is accessed. The study results may provide guidance for selection of the pi circuit accessing point and for optimising the configuration of the shunt and neutralreactors.
源语言英语
页(从-至)694-703
页数10
期刊IET Generation, Transmission and Distribution
卷15
期4
早期在线日期12月 2020
DOI
出版状态已出版 - 2月 2021

基金资助

Nature Science Foundation ofChina, Grant/Award Number: 51907145

收录

  • EI
  • Scopus
  • SCIE

学术指纹

探究 'Open-phase temporary overvoltage before and after an intermediate subsation accessing a long distance transmission line' 的科研主题。它们共同构成独一无二的学术指纹。

引用此