摘要
To counter the contradictions among the electricity generation, flood control and navigation in the Three Gorges Project (TGP) operation, the flood risk and the benefit of generation and shipping in different impounding schemes was studied. The reservoir water sediment regulation multi-purpose decision model was developed according to the relationships among the flood risk, generation and shipping benefit. In order to study its optimum impounding time and mode, a weighted balance mode was applied to decide an optimum impounding scheme. The results can be used for the TGP operation.
| 投稿的翻译标题 | Study on the impounding time and objective decision of the Three Gorges Project at the end of flood period |
|---|---|
| 源语言 | 中文 |
| 页(从-至) | 682-689 |
| 页数 | 8 |
| 期刊 | Advances in Water Science |
| 卷 | 14 |
| 期 | 6 |
| 出版状态 | 已出版 - 1月 2003 |
关键词
- Decision making
- Navigation
- Optimization
- Power generation
- Reservoirs (water)
- Sediments
- Water
- Impounding mode
- Impounding time
- Multipurpose decision
- Optimum impounding scheme
- Three Gorges Project
- Water sediment united operation
- Floods
收录
- Scopus
学术指纹
探究 'Study on the impounding time and objective decision of the Three Gorges Project at the end of flood period' 的科研主题。它们共同构成独一无二的学术指纹。引用此
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver